Hide metadata

dc.date.accessioned2024-02-02T18:03:49Z
dc.date.created2024-01-16T17:25:31Z
dc.date.issued2023
dc.identifier.citationvon der Fehr, Nils-Henrik M. Crampes, Claude . Decentralised cross-border interconnection. Energy Journal. 2023, 44(4), 147-169
dc.identifier.urihttp://hdl.handle.net/10852/107406
dc.description.abstractReaping the full benefits from cross-border interconnection typically requires reinforcement of national networks. When the relevant parts of the networks are complements, a lack of coordination between national transmission system operators results in investment below optimal levels in both interconnectors and national infrastructure. A subsidy to financially sustain interconnector building is not sufficient to restore optimality; indeed, even when possible, such subsidisation may have to be restrained so as not to encourage cross-border capacities that will not be fully utilised due to lack of investment in national systems.
dc.languageEN
dc.publisherInternational Association for Energy Economics
dc.titleDecentralised cross-border interconnection
dc.title.alternativeENEngelskEnglishDecentralised cross-border interconnection
dc.typeJournal article
dc.creator.authorvon der Fehr, Nils-Henrik M.
dc.creator.authorCrampes, Claude
dc.date.embargoenddate2026-11-30
cristin.unitcode185,17,6,0
cristin.unitnameØkonomisk institutt
cristin.ispublishedtrue
cristin.fulltextpostprint
cristin.qualitycode1
dc.identifier.cristin2228098
dc.identifier.bibliographiccitationinfo:ofi/fmt:kev:mtx:ctx&ctx_ver=Z39.88-2004&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.jtitle=Energy Journal&rft.volume=44&rft.spage=147&rft.date=2023
dc.identifier.jtitleEnergy Journal
dc.identifier.volume44
dc.identifier.issue4
dc.identifier.startpage147
dc.identifier.endpage169
dc.identifier.doihttps://doi.org/10.5547/01956574.44.4.ccra
dc.type.documentTidsskriftartikkel
dc.type.peerreviewedPeer reviewed
dc.source.issn0195-6574
dc.type.versionAcceptedVersion


Files in this item

Appears in the following Collection

Hide metadata