Hide metadata

dc.date.accessioned2013-03-12T08:18:07Z
dc.date.available2013-03-12T08:18:07Z
dc.date.issued2008en_US
dc.date.submitted2011-07-14en_US
dc.identifier.urihttp://hdl.handle.net/10852/10371
dc.description.abstractA main field and satellite fields consist of several separate reservoirs with gas cap and/or oil rim. A processing facility on the main field receives and processes the oil, gas and water from all the reservoirs. This facility is typically capable of processing only a limited amount of oil, gas and water per unit of time. In order to satisfy these processing limitations, the production needs to be choked. The available capacity is shared among several field owners with different commercial interests. In this paper we focus on how total oil and gas production from all the fields could be optimized. The satellite field owners negotiate processing capacities on the main field facility. This introduces additional processing capacity constraints (booking constraints) for the owners of the main field. If the total wealth created by all owners represents the economic interests of the community, it is of interest to investigate whether the total wealth may be increased by lifting the booking constraints. If all reservoirs may be produced more optimally by removing the booking constraints, all owners may benefit from this when appropriate commercial arrangements are in place. We will compare two production strategies. The first production strategy optimizes locally, at distinct time intervals. At given intervals the production is prioritized so that the maximum amount of oil is produced. In the second production strategy a fixed weight is assigned to each reservoir. The reservoirs with the highest weights receive the highest priority.eng
dc.language.isoengen_US
dc.publisherMatematisk Institutt, Universitetet i Oslo
dc.relation.ispartofPreprint series. Statistical Research Report http://urn.nb.no/URN:NBN:no-23420en_US
dc.relation.urihttp://urn.nb.no/URN:NBN:no-23420
dc.rights© The Author(s) (2008). This material is protected by copyright law. Without explicit authorisation, reproduction is only allowed in so far as it is permitted by law or by agreement with a collecting society.
dc.titleHydrocarbon production optimization in fields with different ownership and commercial interestsen_US
dc.typeResearch reporten_US
dc.date.updated2011-07-14en_US
dc.rights.holderCopyright 2008 The Author(s)
dc.creator.authorHaavardsson, Nils F.en_US
dc.creator.authorHuseby, Arne Bangen_US
dc.creator.authorPedersen, Frank Børreen_US
dc.creator.authorLyngroth, Steinaren_US
dc.creator.authorXu, Jingzhenen_US
dc.creator.authorAasheim, Tore I.en_US
dc.subject.nsiVDP::410en_US
dc.identifier.urnURN:NBN:no-28492en_US
dc.type.documentForskningsrapporten_US
dc.identifier.duo132637en_US
dc.identifier.fulltextFulltext https://www.duo.uio.no/bitstream/handle/10852/10371/1/stat-res-09-08.pdf


Files in this item

Appears in the following Collection

Hide metadata